| 119th Street Modernization |
Cook County Department of Transportation and Highways |
Highway |
$ 1,100,000 |
$ 1,100,000 |
| 1400N / TR 139 (MVP Road) |
Wade Township / Road District |
Highway |
$ 150,000 |
$ 150,000 |
| 155th Street ADA Improvement Project |
City of Harvey |
Highway |
$ 675,000 |
$ 675,000 |
| 15th Avenue Bridge over Rock River |
City of Rockford |
Highway |
$ 20,243,141 |
$ 17,043,273 |
| 15th Avenue Resurfacing |
Village of Melrose Park |
Highway |
$ 606,000 |
$ 606,000 |
| 171st Street Modernization |
Cook County Department of Transportation and Highways |
Highway |
$ 1,200,000 |
$ 1,200,000 |
| 20-05116-77-BR Honey Creek |
Henderson County Highway Department |
Highway |
$ 900,000 |
$ 900,000 |
| 2025 Roadway Strengthening |
Union Grove Road District |
Highway |
$ 700,000 |
$ 700,000 |
| 2025 Street Program |
City of Zion |
Highway |
$ 815,000 |
$ 815,000 |
| 5th Street Reconstruction |
Village of Orion |
Highway |
$ 1,362,327 |
$ 1,362,327 |
| 95th Street-Chicago State University (CSU) Station Modernization |
Commuter Rail Division of the RTA d/b/a Metra |
Transit |
$ 67,700,000 |
$ 10,000,000 |
| Access Road for Emergency Services |
Village of Scales Mound |
Highway |
$ 750,000 |
$ 650,000 |
| America's Central Port Bissell Street Capacity Expansion |
America's Central Port District |
Ports |
$ 700,000 |
$ 700,000 |
| Appleton Road Grade Separation and Corridor Improvements |
City of Belvidere |
Highway |
$ 2,082,849 |
$ 416,570 |
| Arch Street Bridge |
Village of Tiskilwa |
Highway |
$ 850,000 |
$ 850,000 |
| Ashgrove Bridge |
Ashgrove Township |
Highway |
$ 602,842 |
$ 602,842 |
| Ashmore Pedestrian Facilities Improvements Phase 2 |
Village of Ashmore |
Bike/Ped |
$ 400,000 |
$ 400,000 |
| Ashton Streets 2026 |
Village of Ashton |
Highway |
$ 1,500,000 |
$ 1,500,000 |
| Barrington Avenue Resurfacing Project |
Village of East Dundee |
Highway |
$ 470,000 |
$ 117,500 |
| Batchtown Road Final Phase |
Calhoun County |
Highway |
$ 2,354,000 |
$ 2,054,000 |
| Bauer Bridge Replacement |
Greene County |
Highway |
$ 500,000 |
$ 500,000 |
| Bicycle & Pedestrian Overpass over Illinois 83 |
City of Elmhurst |
Bike/Ped |
$ 3,600,000 |
$ 1,317,796 |
| Bike Trail Phase 10 |
City of Shelbyville |
Bike/Ped |
$ 2,980,342 |
$ 1,758,401 |
| Bingham Road Bridge / SN 026-3014 Replacement |
Fayette County Highway Department |
Highway |
$ 3,250,000 |
$ 3,250,000 |
| Bissell Street Corridor Improvements |
City of Venice |
Highway |
$ 2,909,377 |
$ 2,909,377 |
| Bridge 053-3194 replacement on TR 84 (1100E Rd) approximately 3.75 miles north of Cornell, IL |
Livingston County Highway Department |
Highway |
$ 450,000 |
$ 450,000 |
| Bridge and Roadway Alignment for County Highway 16 over Mud Creek, Coulterville, IL |
Washington County Highway Department |
Highway |
$ 125,000 |
$ 125,000 |
| Bridge Maintenance Project |
Moultrie County |
Highway |
$ 2,500,000 |
$ 2,300,000 |
| Bridge rehabilitation consisting of replacing the existing channel beam deck with precast, pre-stressed, deck beams. |
Williamson County Highway Department |
Highway |
$ 918,000 |
$ 918,000 |
| Brighton-Bunker Hill Road Phase II |
Macoupin County Highway |
Highway |
$ 250,000 |
$ 250,000 |
| Broad Street - Reconstruction |
City of Hillsboro |
Highway |
$ 385,000 |
$ 385,000 |
| Broadway Rd Resurfacing |
Tazewell County |
Highway |
$ 2,150,000 |
$ 2,150,000 |
| Burnham Avenue Modernization |
Cook County Department of Transportation and Highways |
Highway |
$ 1,270,000 |
$ 1,270,000 |
| Burnham Multimodal Connector |
Cook County Department of Transportation and Highways |
Bike/Ped |
$ 2,375,000 |
$ 500,000 |
| Carbondale Road Rehabilitation Project |
City of Carbondale |
Highway |
$ 1,989,063 |
$ 1,989,063 |
| Carrollton Downtown Revitalization Project – Phase II – Design Only |
City of Carrollton |
Highway |
$ 110,100 |
$ 110,100 |
| Cedarville Road FDR Stage 5 in Stephenson County |
Stephenson County |
Highway |
$ 663,000 |
$ 663,000 |
| Centralia Pedestrian Facilities Improvements Phase 1 (Option 2: Phase II Engineering Only) |
City of Centralia |
Bike/Ped |
$ 400,000 |
$ 400,000 |
| CH 1 SN 053-0138 approaches resurfacing located west of Odell on CH 1 going over I-55. |
Livingston County Highway Department |
Highway |
$ 550,000 |
$ 550,000 |
| CH 13 - Mt. Erie Road |
Edwards County Highway Department |
Highway |
$ 2,400,000 |
$ 2,400,000 |
| CH 23 (Guertin Street) Reconstruction |
Kankakee County Highway Department |
Highway |
$ 3,000,000 |
$ 3,000,000 |
| CH 4 Lower Terre Haute Road Safety Corridor – Final Phase |
Edgar County |
Highway |
$ 2,545,861 |
$ 945,861 |
| Charleston - Top 10 Roads Resurfacing |
City of Charleston |
Highway |
$ 975,000 |
$ 975,000 |
| Cherry Road Improvements |
City of Leland Grove |
Highway |
$ 264,116 |
$ 264,116 |
| Cherry Valley Road & Stone Quarry Road Resurfacing in DeKalb County |
DeKalb County |
Highway |
$ 3,200,000 |
$ 3,200,000 |
| Canal Street Viaduct Reconstruction from Harrison Street to Taylor Street |
Chicago Department of Transportation |
Highway |
$ 72,000,000 |
$ 8,000,000 |
| Cicero Avenue Bridge Rehabilitation Over the Sanitary and Ship Canal |
Chicago Department of Transportation |
Highway |
$ 30,000,000 |
$ 9,200,000 |
| Englewood Nature Trail |
Chicago Department of Transportation |
Bike/Ped |
$ 70,000,000 |
$ 10,000,000 |
| South Shore Drive Reconstruction from 71st Street to 79th Street |
Chicago Department of Transportation |
Highway |
$ 3,500,000 |
$ 3,500,000 |
| State/Lake (Loop Elevated) Station in Downtown Chicago |
Chicago Department of Transportation |
Transit |
$ 407,000,000 |
$ 10,000,000 |
| Vison Zero West Side Communities Ogden Avenue Corridor Improvements - Pulaski to Kedzie |
Chicago Department of Transportation |
Highway |
$ 50,000,000 |
$ 10,000,000 |
| Chicago Street Streetscape and Roadway Improvements (Cass Street to Ohio Street) - Phase I & II Engineering |
City of Joliet |
Highway |
$ 2,000,000 |
$ 2,000,000 |
| Chillicothe - Sycamore Street Shared Use Path |
City of Chillicothe |
Bike/Ped |
$ 935,000 |
$ 935,000 |
| Christy Ave. resurfacing |
City of Sumner |
Highway |
$ 450,000 |
$ 450,000 |
| Church Street Milling and Resurfacing |
Village of Xenia |
Highway |
$ 1,070,000 |
$ 1,070,000 |
| City of Aurora - New York St Bridge |
City of Aurora |
Highway |
$ 19,360,000 |
$ 3,872,000 |
| City of Girard Old Route 66 Resurfacing & PROWAG Improvements |
City of Girard |
Highway |
$ 1,520,124 |
$ 1,075,000 |
| City of Le Roy Bike and Pedestrian Access across Interstate 74 Feasibility Study |
City of Le Roy |
Bike/Ped |
$ 150,000 |
$ 150,000 |
| City of Moline River Drive Streetscaping Project |
City of Moline |
Highway |
$ 4,000,000 |
$ 1,000,000 |
| City of Nokomis Downtown Pedestrian-Access Improvement Program |
City of Nokomis |
Bike/Ped |
$ 325,000 |
$ 245,000 |
| City of North Chicago – Argonne Drive Reconstruction Project |
City of North Chicago |
Highway |
$ 18,327,682 |
$ 7,000,000 |
| City of Waukegan CMAQ Washington St Access to Transit Improvements |
City of Waukegan |
Bike/Ped |
$ 480,248 |
$ 301,000 |
| City of Waukegan Genesee Street Bridge Rehabilitation |
City of Waukegan |
Highway |
$ 1,000,000 |
$ 1,000,000 |
| City of Waukegan Resurfacing of 10th Street, Sheridan Road, & Western Avenue |
City of Waukegan |
Highway |
$ 3,200,000 |
$ 3,200,000 |
| Clarksburg Township Bridge Replacement - 087-3198 |
Clarksburg Township |
Highway |
$ 900,000 |
$ 900,000 |
| Cleveland Avenue Realignment Project |
Village of Monee |
Highway |
$ 3,231,000 |
$ 560,000 |
| Corsa Ln Overlay |
White Hall Township |
Highway |
$ 500,000 |
$ 500,000 |
| County Highway 13 Bridge over Pike Creek |
Kankakee County Highway Department |
Highway |
$ 1,250,000 |
$ 250,000 |
| County Highway 13 Overlay |
Wayne Counry highway Department |
Highway |
$ 1,250,000 |
$ 1,000,000 |
| County Highway 13 Widen & Resurface |
Woodford County Highway Department |
Highway |
$ 6,377,500 |
$ 3,852,000 |
| County Highway 14 Bridge over Trim Creek |
Kankakee County Highway Department |
Highway |
$ 1,600,000 |
$ 320,000 |
| County Highway 20 Bridge 010-4058 |
Champaign County |
Highway |
$ 400,000 |
$ 400,000 |
| County Highway 27 Structure Number 029-3000, Phase I & Phase 2 Engineering. |
Fulton County Highway Department |
Highway |
$ 300,000 |
$ 300,000 |
| County Highway 3 (Lake Road) Resurfacing |
Union County Highway Department |
Highway |
$ 2,000,000 |
$ 1,800,000 |
| County Highway 8 Pavement Base Stabilization-19-00077-02-PV |
Moultrie County |
Highway |
$ 1,300,000 |
$ 1,300,000 |
| Curtis Road Complete Streets and Grade Separation Project, located on Curtis Road between Prospect Avenue and First Street in the Village of Savoy |
Village of Savoy |
Highway |
$ 3,350,000 |
$ 3,350,000 |
| Delhi Road Improvements, Phase 3 |
Jersey County Highway Department |
Highway |
$ 2,459,000 |
$ 2,459,000 |
| Dolton Road and State Street Resurfacing Improvements |
Calumet City |
Highway |
$ 4,000,000 |
$ 4,000,000 |
| Douglas County Vehicle Storage Facility Expansion |
Douglas County, Illinois |
Transit |
$ 1,000,000 |
$ 1,000,000 |
| Downtown Reconstruction and Streetscape Project |
Village of Elizabeth |
Bike/Ped |
$ 3,905,000 |
$ 3,905,000 |
| Downtown Rehabilitation - Phase II |
City of Taylorville |
Highway |
$ 525,000 |
$ 460,000 |
| Durand Multi-Use Path |
Village of Durand |
Bike/Ped |
$ 650,000 |
$ 650,000 |
| Dwight Route 66 Bikepath Project |
Village of Dwight |
Bike/Ped |
$ 1,300,000 |
$ 1,300,000 |
| E Patterson Rd Overlay |
Village of Wilmington |
Highway |
$ 300,000 |
$ 300,000 |
| Effingham County Public Transportation Maintenance Facility |
Effingham County |
Transit |
$ 2,745,537 |
$ 600,000 |
| Elkhart area culvert replacements |
Logan County Highway Dept |
Highway |
$ 300,000 |
$ 300,000 |
| Elm Street rehab - 4th to 5th Street |
City of Albion |
Highway |
$ 274,743 |
$ 274,743 |
| Elm Street Resurfacing Project |
Village of Waterman |
Highway |
$ 198,600 |
$ 198,600 |
| Elmwood Park Street Improvements |
Village of Elmwood Park |
Highway |
$ 1,100,000 |
$ 1,100,000 |
| Engineering for Peach Orchard Road Bridge |
Franklin County |
Highway |
$ 50,000 |
$ 50,000 |
| Enhancing Our Streets |
City of East St Louis |
Highway |
$ 5,824,337 |
$ 5,824,337 |
| FAS 222 (CH 22) over Toms Creek SN 066-3013 as C-94-019-22 |
Mercer County Highway Department |
Highway |
$ 730,000 |
$ 730,000 |
| FAS 666 County Line Road (Stage 1) Corridor Reconstruction |
Douglas County Highway Department |
Highway |
$ 6,397,464 |
$ 2,692,000 |
| Five-Lane Connector Road and Adjacent Improvements |
City of Cahokia Heights |
Highway |
$ 10,089,300 |
$ 9,600,000 |
| Flora Pedestrian Facilities Improvements Phase 4 (Option 2: Phase II Engineering Only) |
City of Flora |
Bike/Ped |
$ 400,000 |
$ 400,000 |
| Florida Avenue Shared-Use Path Project |
City of Urbana |
Bike/Ped |
$ 1,602,564 |
$ 757,894 |
| Game Farm Road & Somonauk Road Resurfacing Yorkville |
United City of Yorkville |
Highway |
$ 850,000 |
$ 850,000 |
| Golden Eagle Ferry |
Calhoun County |
Highway |
$ 3,200,000 |
$ 650,000 |
| Grafton Ferry |
City of Grafton |
Highway |
$ 1,458,000 |
$ 1,458,000 |
| Grapevine Trail Bridge over Clear Creek |
Alexander County Highway Department |
Highway |
$ 7,000,000 |
$ 1,600,000 |
| Gravel To Bituminous Surface Conversion |
Perry County Unit Road District |
Highway |
$ 10,500,000 |
$ 5,000,000 |
| Greater Downtown Revitalization Project |
City of East Moline |
Highway |
$ 10,923,128 |
$ 1,935,671 |
| Greenville Pedestrian Facilities Improvements Phase 6 (Option 2: Phase II Engineering Only) |
City of Greenville |
Highway |
$ 400,000 |
$ 400,000 |
| Grigsby Intermediate School Shared Use Path Enhancements |
City of Granite City |
Bike/Ped |
$ 566,345 |
$ 281,248 |
| Grundy County Transit Center - Phase 2 Construction |
County of Grundy |
Transit |
$ 3,545,000 |
$ 3,545,000 |
| Hampshire Street Medical Corridor Project |
City of Quincy |
Highway |
$ 4,500,000 |
$ 3,000,000 |
| Hanover Park Metra ADA Improvements |
Village of Hanover Park |
Transit |
$ 400,000 |
$ 400,000 |
| Hebron Trail Overpass: Phase 1 & 2 Engineering |
McHenry County Conservation District |
Highway |
$ 320,000 |
$ 320,000 |
| Hickory Hill / Butternut Paving |
Clay County Highway Department |
Highway |
$ 750,000 |
$ 750,000 |
| Hogue Town Road Improvements |
Clark County |
Highway |
$ 6,800,000 |
$ 561,000 |
| Holiday Bridge Replacement, Polk Township, Macoupin County, IL |
Polk Township- Macoupin County |
Highway |
$ 1,750,000 |
$ 1,750,000 |
| Hoopeston Sidewalk |
Hoopeston |
Bike/Ped |
$ 100,000 |
$ 100,000 |
| Humbert Road Resurfacing |
Madison county Highway Department |
Highway |
$ 500,000 |
$ 500,000 |
| IL Route 9 Corridor Improvements (Empire) - Towanda to Carnahan |
City of Bloomington |
Highway |
$ 22,000,000 |
$ 1,227,050 |
| Illinois Route 38 (Roosevelt Road) Sidewalk and Street Lighting Improvements |
Village of Glen Ellyn |
Bike/Ped |
$ 400,000 |
$ 400,000 |
| Indian Creek Bridge |
Edwards County Highway Department |
Highway |
$ 410,000 |
$ 410,000 |
| Intersection of Main and South Main at the Railroad Crossing in Brighton |
Village of Brighton |
Highway |
$ 100,000 |
$ 80,000 |
| Jasper Co Courthouse Square Streetscape (Option 1: Phase II Engineering and Construction) |
Jasper County |
Bike/Ped |
$ 1,000,000 |
$ 1,000,000 |
| Jefferson St & Main St. Intersection Improvements |
Mason City |
Highway |
$ 400,000 |
$ 400,000 |
| Kempton Road |
Ford County Highway Department |
Highway |
$ 600,000 |
$ 600,000 |
| Kimball Street over the Fox River Bridge Replacement Project |
City of Elgin |
Highway |
$ 3,321,000 |
$ 1,682,600 |
| Lafayette Street Reconstruction |
City of Rushville |
Highway |
$ 1,673,977 |
$ 378,623 |
| Lee Center Road HMA |
Lee County Highway Department |
Highway |
$ 783,000 |
$ 783,000 |
| Longacre Drive Improvements in the City of Fairview Heights |
City of Fairview Heights |
Highway |
$ 1,000,000 |
$ 1,000,000 |
| Madison Avenue Corridor Improvements from 23rd Street to 27th Street |
City of Granite City |
Highway |
$ 2,698,948 |
$ 1,404,088 |
| Madison Avenue Corridor Improvements from City Limits to City Limits |
City of Madison |
Highway |
$ 4,516,416 |
$ 2,924,445 |
| Main & Hargrave Reconstruction |
The City of Athens |
Highway |
$ 2,200,000 |
$ 440,000 |
| Main Street – Streetscape – Phase IV |
City of Columbia |
Bike/Ped |
$ 1,329,000 |
$ 200,000 |
| Main Street Reconstruction |
City of Morrison |
Highway |
$ 297,800 |
$ 297,800 |
| Main Street Sidewalk Improvements Project |
Village of Iuka |
Highway |
$ 300,000 |
$ 300,000 |
| Manchester Street Overlay |
Village of Patterson |
Highway |
$ 300,000 |
$ 300,000 |
| Maroa Wood Street Bike & Pedestrian Improvements |
City of Maroa |
Bike/Ped |
$ 275,000 |
$ 275,000 |
| Mattoon Loop Road and Dettro Drive Expansion Project |
City of Mattoon |
Highway |
$ 4,061,280 |
$ 3,711,280 |
| McConnell Road/IL Route 26 intersection in Stephenson County |
Stephenson County |
Highway |
$ 1,477,567 |
$ 1,455,567 |
| McLean County Historic Route 66 Bike Trail from McLean to Funks Grov |
County of McLean |
Bike/Ped |
$ 3,967,446 |
$ 350,000 |
| McLean County Historic Route 66 Bike/Pedestrian Trail from Lexington to Chenoa |
County of McLean |
Bike/Ped |
$ 1,875,000 |
$ 1,875,000 |
| Michigan City Road Modernization |
Cook County Department of Transportation and Highways |
Highway |
$ 1,600,000 |
$ 1,600,000 |
| Millstadt - Madison Street Sidewalk |
Village of Millstadt |
Bike/Ped |
$ 1,030,394 |
$ 515,000 |
| Morrison Route Culvert Replacement and FDR Phase 1 and 2 |
Carroll County |
Highway |
$ 10,005,000 |
$ 800,000 |
| Mt. Gilead Lane Bridge Wetland Mitigation |
Richland County Highway Department |
Highway |
$ 400,000 |
$ 400,000 |
| Multi-Use Path |
City of Kankakee |
Bike/Ped |
$ 5,000,000 |
$ 5,000,000 |
| Municipal Commuter Rail Parking Lot Improvements |
Village of Riverdale |
Transit |
$ 823,000 |
$ 823,000 |
| N Spruce St. Overlay |
City of Roodhouse |
Highway |
$ 100,000 |
$ 100,000 |
| N. 42nd Street and N. 44th Street Improvements |
Village of Faimont City |
Highway |
$ 670,000 |
$ 670,000 |
| N. Grand Ave Reconstruct |
Village of Grandview |
Highway |
$ 250,000 |
$ 250,000 |
| N. Market Street, Pavement Reconstruction |
City of Paxton, IL |
Highway |
$ 1,200,000 |
$ 1,200,000 |
| NE 175 Ave Overlay |
Roodhouse Township |
Highway |
$ 250,000 |
$ 250,000 |
| North Mine Street Reconstruction |
City of Breese |
Highway |
$ 1,100,000 |
$ 1,037,280 |
| North Thompsonville Road |
Franklin County |
Highway |
$ 1,800,000 |
$ 1,800,000 |
| NW 650 Ave Elevation |
Greene County |
Highway |
$ 150,000 |
$ 150,000 |
| Oakland Pedestrian Facilities Improvements Phase 1 (Option 1: Phase II Engineering and Construction) |
City of Oakland |
Bike/Ped |
$ 1,500,000 |
$ 1,500,000 |
| Oreana SafeTEA-LU Street Improvements |
Village of Oreana |
Highway |
$ 4,600,000 |
$ 3,893,000 |
| Ottawa Port District Inter-modal Rail Yard and Railroad Crossing Conflict Improvements |
Ottawa Port District |
Ports |
$ 2,010,000 |
$ 2,010,000 |
| Ottawa Post Street Bridge Replacement |
City of Ottawa |
Highway |
$ 1,725,000 |
$ 1,725,000 |
| Pankey Road Resurfacing |
Saline County Highway Department |
Highway |
$ 450,000 |
$ 450,000 |
| Parking Lot and Transfer Location for Shawnee Mass Transit District |
Shawnee Mass Transit DIstrict |
Transit |
$ 314,500 |
$ 314,500 |
| Perry Road truck route in DeKalb County |
DeKalb County |
Highway |
$ 2,550,000 |
$ 1,850,000 |
| Placing an A-2 Bituminous Surface Treatment on FAS 885 |
White County Highway Department |
Highway |
$ 232,320 |
$ 232,320 |
| Plum Street Reconstruction |
City of Farmer City |
Highway |
$ 750,000 |
$ 750,000 |
| Project Rock |
City of Dixon |
Bike/Ped |
$ 15,357,499 |
$ 4,610,154 |
| Reas Bridge gap funding |
Macon County |
Highway |
$ 32,779,200 |
$ 3,000,000 |
| Red Purple Modernization Program- Phase Two NEPA |
Chicago Transit Authority |
Transit |
$ 6,000,000 |
$ 6,000,000 |
| Remove and Replace Structure 009-3020 on CH-8 |
Cass County |
Highway |
$ 1,500,000 |
$ 1,500,000 |
| Replacement of Structure 044-0015 Over Dutchman Creek on Old Route 146 Loop |
Johnson County Unit Road District |
Highway |
$ 1,242,500 |
$ 248,500 |
| Resurface Dongola Road |
Johnson County |
Highway |
$ 515,000 |
$ 515,000 |
| Ridge Road |
Village of Hopkins Park |
Highway |
$ 960,000 |
$ 960,000 |
| Ridgeland Avenue/Narragansett Avenue/Nagle Avenue Modernization |
Cook County Department of Transportation and Highways |
Highway |
$ 2,500,000 |
$ 2,500,000 |
| River Road and Stouffer Road Resurfacing |
Sterling Road District |
Highway |
$ 252,825 |
$ 252,825 |
| Riverwood Road and Country Club Drive |
Sun River Terrace |
Highway |
$ 1,500,000 |
$ 1,500,000 |
| Road & Culvert Repair |
St. Anne Township |
Highway |
$ 150,000 |
$ 150,000 |
| Roadway Reconstruction for Airport Road |
City of Salem |
Highway |
$ 300,000 |
$ 300,000 |
| Sawmill Bridge |
Warren County |
Highway |
$ 1,853,750 |
$ 370,750 |
| Sesser to Rend Lake Multi-Use Path |
City of Sesser |
Bike/Ped |
$ 150,000 |
$ 150,000 |
| Shabbona Pathway Project - Segment 2 |
Shabbona Township |
Bike/Ped |
$ 700,000 |
$ 260,000 |
| Shawnee College Road Section 24-0079-RS |
Pulaski County Highway Department |
Highway |
$ 5,543,625 |
$ 4,043,650 |
| Sheldon Bridge 24-25103-01-BR |
Iroquois County Highway Department |
Highway |
$ 500,000 |
$ 500,000 |
| Sheridan Road Reconstruction Project |
Peoria County |
Highway |
$ 10,000,000 |
$ 10,000,000 |
| Sinnissippi Road & Sinnissippi Park Road |
Sterling Road District |
Highway |
$ 90,000 |
$ 90,000 |
| Sparta - Monroe Randolph Transit District New Facility's Construction of Covered Bus Parking/Asphalt Surface |
Monroe Randolph Transit District |
Transit |
$ 3,465,000 |
$ 465,000 |
| Spotsylvania |
Village of New Athens |
Highway |
$ 1,400,000 |
$ 450,000 |
| Springfield Rail Improvements Project |
City of Springfield |
Highway |
$ 278,321,908 |
$ 10,000,000 |
| State Street Modernization |
Cook County Department of Transportation and Highways |
Highway |
$ 1,700,000 |
$ 1,700,000 |
| Staunton-Bunker Hill Road |
Macoupin County Highway Department |
Highway |
$ 200,000 |
$ 200,000 |
| Sterling West LeFevre Road |
City of Sterling |
Highway |
$ 4,920,000 |
$ 4,920,000 |
| Storm Sewer and Drainage Improvements |
Village of Central City |
Highway |
$ 1,462,405 |
$ 1,462,105 |
| Stoy bridge replacement |
Crawford County Highway Department |
Highway |
$ 750,000 |
$ 750,000 |
| Sullivan Street Reconstruction |
Village of Industry |
Highway |
$ 241,800 |
$ 241,800 |
| Summit Avenue Improvements - Phase 1 |
City of Collinsville |
Highway |
$ 2,090,000 |
$ 1,300,000 |
| Texico Bridge |
Jefferson County Highway Department |
Highway |
$ 700,000 |
$ 700,000 |
| Third Ward |
City of Blue Island |
Highway |
$ 2,114,000 |
$ 2,114,000 |
| Thorn Creek Bridge at Sauk Trail |
Cook County Department of Transportation and Highways |
Highway |
$ 6,500,000 |
$ 5,232,000 |
| Touhy Avenue: Elmhurst Road to Mt. Prospect Avenue |
Cook County Department of Transportation and Highways |
Highway |
$ 86,000,000 |
$ 5,000,000 |
| Township Road 114 (1300E Road) over Mud Run Creek |
Stark County |
Highway |
$ 550,000 |
$ 555,000 |
| Tyler Timmins Dr. Improvements |
City of Wood River |
Highway |
$ 4,000,000 |
$ 400,000 |
| Union Hill Road Reconstruction - Phase 3 |
Jackson County dba Jackson County Highway Department |
Highway |
$ 2,200,000 |
$ 2,200,000 |
| Uptown Normal Underpass |
Town of Normal |
Bike/Ped |
$ 39,994,310 |
$ 2,500,000 |
| Urbana Township Bridge 010-4150 |
Champaign County |
Highway |
$ 2,165,000 |
$ 433,000 |
| US 51 Business Corridor Improvements (Main/East and Center/Madison)-Olive to Division |
City of Bloomington |
Highway |
$ 50,000,000 |
$ 2,500,000 |
| Utility Adjustment: US 51 Pavement Reconstruction |
City of Du Quoin |
Highway |
$ 3,719,705 |
$ 800,000 |
| Various Street Milling and Resurfacing |
Village of Louisville |
Highway |
$ 1,300,000 |
$ 1,300,000 |
| Village of Albany Church Street Resurfacing and ADA Improvements Design |
Village of Albany |
Highway |
$ 150,000 |
$ 150,000 |
| Village of Albany Downtown Streetscape, ADA, and Sidewalk Improvements |
Village of Albany |
Highway |
$ 430,000 |
$ 430,000 |
| Village of Lisbon - Sidewalk Installation Project |
Village of Lisbon |
Bike/Ped |
$ 400,000 |
$ 400,000 |
| Village of Lovington - West Okaw River Bike and Pedestrian Trail |
Village of Lovington |
Bike/Ped |
$ 1,100,000 |
$ 1,100,000 |
| Village of Lyndon Downtown Streetscape, ADA, and Sidewalk improvements |
Village of Lyndon |
Bike/Ped |
$ 370,000 |
$ 370,000 |
| Village of Mount Morris Downtown Improvements - Wesley Street |
Village of Mount Morris |
Highway |
$ 3,250,000 |
$ 3,250,000 |
| Village of Mount Zion Main Street Overlay |
Village of Mount Zion |
Highway |
$ 143,000 |
$ 143,000 |
| Village of Sauk Village Local Roadway Improvements - 224th Street, Jeffrey Avenue, Reichert Avenue, Chappel Avenue, Clyde Avenue |
Village of Sauk Village |
Highway |
$ 2,110,000 |
$ 2,110,000 |
| Village of Sauk Village Local Roadway Improvements - Kalvelage Drive, Yates Avenue, Strassburg Avenue, Merrill Avenue |
Sauk Village |
Highway |
$ 1,200,000 |
$ 1,200,000 |
| Village of South Jacksonville South Diamond Street Reconstruction |
Village of South Jacksonville |
Highway |
$ 1,547,956 |
$ 1,107,521 |
| Village of Stockton Downtown and Streetscape Project |
Village of Stockton |
Highway |
$ 1,620,000 |
$ 1,620,000 |
| Village of Walnut – Main Street Multi-Use Path Project |
Village of Walnut |
Bike/Ped |
$ 474,400 |
$ 117,256 |
| W Barrow Road Overlay |
Patterson Township |
Highway |
$ 1,000,000 |
$ 1,000,000 |
| Water Street & Madison Street Reconstruction |
City of Sullivan |
Highway |
$ 2,500,000 |
$ 1,720,000 |
| Weber Road: Airport Road to 135th Street - Romeoville |
Will County |
Highway |
$ 43,319,900 |
$ 750,000 |
| West Chain of Rocks Bridge Intermediate Repairs to Increase Load Limit |
City of Madison |
Highway |
$ 7,300,000 |
$ 3,883,000 |
| West LeFevre Road Cold In Place Recycling and McCue Road Resurfacing |
Sterling Road District |
Highway |
$ 245,100 |
$ 245,100 |
| West Main Street 28th St. to 49th St. Road Diet |
City of Belleville |
Highway |
$ 3,290,000 |
$ 1,020,000 |
| West Solon Road over North Branch Nippersink Creek |
McHenry County Division of Transportation |
Highway |
$ 5,500,000 |
$ 2,100,000 |
| Wheeler Road Improvements |
Village of Hopkins Park |
Highway |
$ 7,200,000 |
$ 7,200,000 |
| Wisconsin Avenue |
City of Peoria |
Highway |
$ 6,900,000 |
$ 6,900,000 |
| Witt Pedestrian Facilities Improvements Phase 1 (Option 2: Phase II Engineering Only) |
City of Witt |
Highway |
$ 400,000 |
$ 400,000 |
| Woodstock - IDOT IL 47 Expansion |
City of Woodstock |
Highway |
$ 22,801,457 |
$ 10,000,000 |